Mining camp
178 units for a mining operation beside the haul road — dormitories and site facilities, delivered packed and installed in phases.

Project at a glance
178 units on one site is a logistics problem before it is a building problem: phased deliveries, packed units and one bolted detail repeated 178 times.
Project challenge
The mining project required 178 units beside a haul road, with accommodation and site facilities delivered and installed in phases under tropical seasonal rain.
Approach
Flat-pack units were packed for container shipment and assembled on site, using repeated structural details and phased site logistics suited to a large camp.
Delivery and installation
Delivery and installation were organised in phases. Packing lists, container loading and site handover were coordinated with the camp construction programme.
Outcome
The project shows how repeatable accommodation can be shipped and installed for a large remote workforce while keeping site logistics manageable.

See the system used
Flat Pack Container Houses
- Units per 40HQ container
- 6–8
- Installation
- 1 person · 1 unit/day
- Lead time
- 20 days per 100 sets
Other reference projects
All photographs on this page are site photographs of delivered or in-progress projects, not renderings. Project details come from our own records. Buyer references are available on request, with their permission.