+86 183 6563 6536sales@cyprefab.com
CYPrefabMODULAR BUILDINGS · BETTER LIVING

Home › Buyer guides › 40HQ loading and shipping guide

Practical buyer guides

40HQ loading and shipping guide

Plan modular building shipments around packing density, door and window configuration, panel thickness, loading access and destination documentation.

Reviewed by Lewis Yu · Last updated 19 Nov 2026

Standard flat-pack container unit, exterior view

Why loading quantities are ranges

The number of units in a 40HQ depends on the model, panel thickness, door and window count, packing method and how components are nested. A figure on a product page is a planning reference until the configuration is confirmed.

Separate the product from the packing kit

Frames, panels, doors, windows, hardware and documentation may be packed in different bundles. Ask for the packing list and loading photographs so the receiving site knows what should arrive.

Agree the shipping boundary

FOB, CIF and DDP place different responsibilities on the buyer and seller. Confirm loading port, destination port, freight scope, insurance, import clearance and inland transport in writing.

  • Loading port: Qingdao, China
  • Incoterms currently offered: FOB, CIF, DDP
  • Payment terms are confirmed per order

Checks before booking

Confirm the approved model, quantity, packing plan, container type, gross weight limit, destination restrictions and required documents before the booking is fixed.

  • Signed configuration and drawings
  • Container loading plan
  • Packing list per unit
  • Bill of lading and certificate of origin requirements
  • Destination customs or import restrictions
Get a quoteWhatsApp