Site preparation and installation checklist

Prepare the foundation, access, offloading, utilities and inspection plan before modular units arrive on site.

Reviewed by Lewis Yu · Last updated 19 Nov 2026

Standard flat-pack container unit, exterior view

Confirm the foundation and drainage

The foundation type depends on the model, soil, climate and local requirements. Finished floor level, drainage and connection points must match the approved drawings.

Check the delivery route

Confirm road width, gate clearance, turning radius, ground bearing capacity, offloading area and lifting equipment. A site that can receive a truck may still lack space to store modules safely.

Separate mechanical work from utility work

Base and anchoring, electrical supply, water, sewage and earthing are normally site responsibilities. Confirm the boundary in the quotation so the installation crew is not waiting for missing services.

  • Foundation and anchoring
  • External power supply
  • Water and sewage connection
  • Earthing and local compliance
  • Crane, forklift and site labour

Inspect before closing panels

Record the frame, insulation, openings, electrical routing and sealant work before final closing. Keep delivery, unpacking, assembly and handover photographs for future maintenance.